BJK - Besiktas Futbol Yatirimlari Sanayi ve Ticaret AS
type of work done:
turnkey construction works.
date of work:
2003 - 2004
Emlo completed works at Beşiktaş İnönü Stadium in 45 days. The work included lowering the stadium level, increasing spectator capacity by 13,500 and installing more than 300 tonnes of steelwork.